C30: OEE of Crankcase Line
Installation
Crankcase line with 22 CNC machines and 7 PLC based machines
Customer
- Kirloskar Oil Engines Ltd., Kagal Plant
Challenges
- Lack of control on productivity and losses
- No visibility in QA inspection data
Solution
PlantConnect SFactory deployed with following modules
- Real time production monitoring (OEE)
- Shop floor workflow
- Loss analysis
- Condition based processing
- Alarms and alerts
- Digitalization Module (QA inspection forms)
CNC machines are connected on FANUC MTLinki protocol and PLC based machines are connected using electrical signals
Key Outcomes- Real time visibility of OEE and losses
- Reduction in line downtime
- Line productivity improvement
FANUC MTLinki & Modbus Connectivity
Smart Touch Screen
Interlock
Inspection Forms
Profibus Connectivity
Industrial HMI
Interlock
Enterprise Integration